Over 150 years of experience        Free Shipping on orders $40 and up        Fast delivery
Magnum

Long Lead EDC

$44.95 *

* Sales tax and shipping costs will be charged separately.

Not available

  • Magnum
  • Pocket Knives
  • 7.24 in
  • 3.15 in
  • 0.11 in
  • 2.75 oz
  • 440B
  • G10
  • Nail Nick
  • Manual
  • Slipjoint
  • Asia
  • 01SC080
Laser Engraving
Frontside (+ $9.95 / *)
reset
Backside (+ $9.95 / *)
reset
Father's Day Logo (+ $9.95 / *)
reset
Mother's Day Logo (+ $9.95 / *)
reset
Valentine's Day Logo (+ $19.95 / *)
reset
Kitchen & BBQ (+ $9.95 / *)
reset
* Required field
The Magnum Long Lead EDC is a classic gentleman's and gourmet pocket knife for everyday use. Its simple, slightly curved design is instantly appealing. The no-frills design also corresponds to its technical construction as a slip-joint...read more
The Magnum Long Lead EDC is a classic gentleman's and gourmet pocket knife for everyday use. Its simple, slightly curved design is instantly appealing. The no-frills design also corresponds to its technical construction as a slip-joint knife, which has proven itself a million times over thanks to its ease of use and fewer components. The satin-finished blade made of 440B stainless steel is flat-ground, is opened by nail nick and does not lock. The lightly contoured handle scales made of textured G10 fit comfortably in the hand. With clip (tip-down/r).
Read, write and discuss reviews...Read or write reviews
Reviews for "Long Lead EDC"
Write a review
Reviews will be activated after a verification.
Wenn Sie sich Anmelden könnten Sie einen Gutschein für ihre Bewertung erhalten

The fields marked with * are required.

01bo343
Böker Plus Kwaiken Air G10 Jade

Available

  • Pocket Knives
  • VG-10
  • G10
  • Lucas Burnley
  • Linerlock
  • Flipper
$145.95 *
01bo179
Böker Plus Celos G10 Jade

Available

  • Pocket Knives
  • 440C
  • G10
  • Slipjoint
  • Nail Nick
$76.95 *
Sheath, Brown
Böker Manufaktur Leather Sheath Trapper

Available

  • Sheath
$44.95 *
Pocket Knives, Black, Flipper, Linerlock, D2, G10
Böker Plus Caracal Folder Mini

Available

  • Pocket Knives
  • D2
  • G10
  • Boris Manasherov
  • Linerlock
  • Flipper
$120.95 *

Magnum

Magnum offers a wide range of knives from all categories, from traditional pocket knives to hunting knives and modern tactical knives. The attractive Boker brand is known for its unbeatable price-performance ratio. However, it is not only the price-sensitive knife enthusiast who is fascinated by the wide range of handle materials and practical blade steels. The concept takes place in Solingen, design, construction and finishing in Asia.

Magnum offers a wide range of knives from all categories, from traditional pocket knives to hunting knives and modern tactical knives. The attractive Boker brand is known for its unbeatable... more

Show products